Embankment
River protection work with embankment and construction of road embankment are very common now. It’s a 2D cross sectional manner with long way.
Construction of 3rd & 4th dual gauge track in Dhaka-Tongi section & doubling of dual gauge track between Tongi- Joydevpur section
Design of sheet pile, design of slab bridge,
Design of Ground Treatment, Revised Design of Bridge Pier and Abutment Foundations. Revised design 3 span steel girder bridge (BR-47)
Development and Operation of Two Jetties at Mongla Port Through PPP
The container terminal of Mongla Port needs to be built on 10-20 m thick variable soft clay.





